Study tools should disappear into the background. Prep4SureReview builds its SAP Certified - Database Administrator - SAP HANA platform around people, not features — so the 216 practice questions are all you notice.
SAP C_DBADM Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Technology Associate - SAP HANA 2.0 (SPS) - Database Administrator |
| Exam Number: | C_DBADM |
| Related Certifications: | SAP Certified Technology Associate - SAP HANA 2.0 |
| Passing Score: | Approximately 65% - 67% |
| Exam Price: | USD 500 (varies by region) |
| Exam Duration: | 180 minutes |
| Available Languages: | English |
| Certificate Validity Period: | Not explicitly fixed; subject to SAP certification policy and updates |
| Exam Format: | Multiple Choice, Multiple Response |
| Real Exam Qty: | 80 |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored or test center based exam via SAP Certification platform |
| Pre Condition: | Basic knowledge of SAP HANA database concepts and administration experience recommended |
| Official Syllabus URL: | https://training.sap.com/certification/c_dbadm/ |
SAP C_DBADM Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| User and Security Management | - Security best practices in SAP HANA - Authorization concepts - User provisioning and role management |
| Database Operations and Data Provisioning | - Data provisioning methods (SDI, SLT) - Backup and recovery procedures - Replication and data synchronization |
| High Availability and Disaster Recovery | - Failover and recovery strategies - System replication concepts |
| SAP HANA Architecture and Administration | - Installation and initial configuration - SAP HANA system architecture components - System landscape overview |
| Performance Monitoring and Tuning | - Workload and resource management - Performance analysis and optimization - System monitoring tools |
C_DBADM FAQ: Read Before You Register
The SAP Certified - Database Administrator - SAP HANA blueprint divides into 5 domains — including SAP HANA Architecture and Administration, Performance Monitoring and Tuning, User and Security Management. Those weights tell you where the points live; plan revision time in the same proportions. The full subtopic list appears above.
Basic knowledge of SAP HANA database concepts and administration experience recommended Eligibility rules change occasionally, so confirm them on the official page (official C_DBADM exam page) before booking.
Yes — the free SAP Certified - Database Administrator - SAP HANA demo at Prep4SureReview shows real questions and answers before you pay. Every purchase includes 365 days of free updates, renewable later at 50% off.
The official format: 180 minutes, 80 questions. That ratio is the real challenge, so practice pacing — time-box each question, mark the stubborn ones, and run full simulations in the Prep4SureReview PC test engine until the clock stops being scary.
The SAP Certified - Database Administrator - SAP HANA is SAP's official exam for the SAP Certification Exams credential (Associate level). In the job market it works as portable proof of skill — more interviews, better offers. It pairs naturally with SAP Certified Technology Associate - SAP HANA 2.0.
Two promises. Delivery: payment triggers an automatic email within a minute — instant download, unlimited devices, 24/7 help if nothing arrives within 2 hours. Refund: take the corresponding C_DBADM exam within 60 days of purchase, and if you fail, send a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam for a full refund, processed within 7 days. Excluded: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products. Prefer a swap? Exchange for two equal-value products free.
USD 500 (varies by region) per attempt; Approximately 65% - 67% to pass. Since a retake bills the full fee again, rehearse with the 216 practice questions from Prep4SureReview until your mock scores clear the bar with room to spare.
SAP Certified - Database Administrator - SAP HANA Sample Questions:
A regional water services company uses SAP HANA for operational consumption analytics in an on-premises administration environment. After planned maintenance, the database starts and SAP HANA cockpit shows the system as available. During validation, an administrator runs an hdbsql check from the operations workstation and receives a connection response from a different database endpoint than the one recorded in the maintenance plan. The old endpoint was retained in a saved connection profile used by the operations team.
The constraint is that the administrator must validate the intended SAP HANA database before reopening scheduled administration checks. The team must not treat a successful connection as proof that the correct database target was reached.
Which action best resolves the validation issue?
- A. orrect the saved connection profile to the intended database endpoint, rerun the hdbsql check, and validate the target identity.
- B. estart the intended database so the saved connection profile automatically redirects to the active endpoint.
- C. ecreate the administrator user because a wrong endpoint response indicates the user was assigned to the wrong database.
- D. ccept the validation because hdbsql returned a successful connection response from an SAP HANA database.
Correct Answer: A 🗳️
Explanation: Only visible for Prep4SureReview members. You can sign-up / login (it's free).
<strong>CHALLENGE 2 — Close Aggregation Monitoring Evidence</strong> Claims reserve aggregation ran longer than expected during close rehearsal. Some monitoring thresholds were copied from the prior monthly profile before the upgrade. The reporting lead wants immediate tuning before the next rehearsal. What should the database owner do first?
- A. alidate current monitoring thresholds and preserve baseline evidence before approving tuning.
- B. ove aggregation tuning to SAP HANA Cloud because future reporting may transition there.
- C. pply tuning immediately because the close aggregation runtime affects business timing.
- D. isable aggregation monitoring so the next rehearsal focuses only on report completion.
Correct Answer: A 🗳️
Explanation: Only visible for Prep4SureReview members. You can sign-up / login (it's free).
A regional utilities billing provider uses SAP HANA for meter usage analytics in an on-premises administration environment. After a planned stop and start sequence, SAP HANA cockpit shows the database as available. During post-start validation, the administrator finds that a scheduled health-check job did not run because its execution window still references the pre-maintenance calendar setting. Manual checks succeed, and the support team wants to close the activity because user dashboards are accessible.
The constraint is that the administrator must confirm routine post-start administration is restored before closure. The validation must prove scheduled execution readiness, not only manual access or database availability.
Which action best resolves the post-start validation gap?
- A. orrect the scheduled job execution window, run or validate the next planned health-check execution, and record the result.
- B. lose the activity because SAP HANA cockpit availability and successful manual checks prove operational readiness.
- C. estart the database again so the scheduled health-check job can inherit the current maintenance calendar automatically.
- D. eplace the scheduled health check with an on-demand manual check for the next reporting cycle.
Correct Answer: A 🗳️
Explanation: Only visible for Prep4SureReview members. You can sign-up / login (it's free).
<strong>CHALLENGE 2 — Traceability Workload Monitoring Baseline</strong> Late-shift lot-history aggregation shows variable response time during rollout testing. The plant operations manager asks for tuning before the next checkpoint, but the current monitoring baseline has not yet been captured. What should the database owner do first?
- A. isable late-shift monitoring so the next checkpoint focuses only on report completion.
- B. pply tuning immediately because late-shift reporting volume is business critical.
- C. apture the monitoring baseline and validate threshold relevance before approving tuning.
- D. ove the tuning decision to SAP HANA Cloud because analytics modernization is planned.
Correct Answer: C 🗳️
Explanation: Only visible for Prep4SureReview members. You can sign-up / login (it's free).
<strong>CHALLENGE 4 — SIT Recovery Evidence Sequencing</strong>
Backups completed before SIT began for the upgraded and newly installed SAP HANA databases. The installed test database has recovery validation scheduled before the second SIT cycle, but it is not yet complete. What should happen before releasing the next SIT cycle?
- A. elease the cycle because completed backups are enough for integration testing continuity.
- B. elease the cycle and perform recovery validation only if the database becomes unavailable.
- C. eplace recovery validation with dashboard availability because SIT is not production.
- D. omplete recovery validation and document startup behavior before release approval.
Correct Answer: D 🗳️
Explanation: Only visible for Prep4SureReview members. You can sign-up / login (it's free).
Viewing page 1 out of 44 pages.
Viewing questions 1-5 out of 216 questions.







