1z0-1075-20 Free Exam Questions Answers PDF Updated on Dec-2021 Latest 1z0-1075-20 Exam Dumps Recently Updated 65 Questions NEW QUESTION 18 During a Manufacturing Cloud implementation, the Production Supervisor wants to close the work orders for last month and wants to make sure that the work orders include the correct cost.Identify the approach to be taken by the Production Supervisor. A. The Production [...]

1z0-1075-20 Free Exam Questions & Answers PDF Updated on Dec-2021 [Q18-Q35]

Share

1z0-1075-20 Free Exam Questions & Answers PDF Updated on Dec-2021

Latest 1z0-1075-20 Exam Dumps Recently Updated 65 Questions

NEW QUESTION 18
During a Manufacturing Cloud implementation, the Production Supervisor wants to close the work orders for last month and wants to make sure that the work orders include the correct cost.
Identify the approach to be taken by the Production Supervisor.

  • A. The Production Supervisor needs to include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected, should not be closed.
  • B. Work order costs can be updated anytime regardless of the status of the work order.
  • C. The Production Supervisor need not include cost variances while costing last month's work orders because those can be applied directly in subledger accounting.
  • D. The Production Supervisor should make sure that all costs are included while closing last month's work orders; however, variances can be included after closing the work orders.

Answer: A

 

NEW QUESTION 19
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?

  • A. Update Work Definitions
  • B. Create Work Definitions
  • C. Populate Descriptive flexfields
  • D. Create and update ATO (Assemble To Order) model work definitions

Answer: C,D

 

NEW QUESTION 20
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for that week.

  • A. 76 hours
  • B. 70 hours
  • C. 78 hours
  • D. 60 hours

Answer: C

 

NEW QUESTION 21
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of products manufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally.
Identify two different ways of achieving this requirement.

  • A. Set up Plants as Inventory Organizations, Distribution Centers as Inventory Organizations, and Corporate Engineering organizations as Item Organization.
  • B. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Inventory Organization.
  • C. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Item Organization.
  • D. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Inventory Organization.
  • E. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Item Organization

Answer: A,E

 

NEW QUESTION 22
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.

  • A. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC.
  • B. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC.
  • C. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common.
  • D. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common.

Answer: D

 

NEW QUESTION 23
In a manufacturing plant, a production operator in a given shift completes a car assembly and reports this using orderless completion by referencing a Work Definition.
Identify the two purposes of the referenced Work Definition in Orderless reporting.

  • A. Processing steps
  • B. Scrap material
  • C. Material usage
  • D. Resource usage
  • E. Return material

Answer: C,D

 

NEW QUESTION 24
One of the key execution capabilities that Oracle Manufacturing Cloud offers is that you can generate and manage work order exceptions.
Which option shows the production exception types that can be reported by the production operator?

  • A. Work Area, Work Center, Resources, Components, and Miscellaneous
  • B. Work Center and Resources
  • C. Work Area, Work Center, and Resources
  • D. Work Area, Work Center, Resources, and Components
  • E. Resources and Components

Answer: E

 

NEW QUESTION 25
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

  • A. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
  • B. Set a local sourcing rule in GOP to determine supply creation option as Make.
  • C. Set the global sourcing rule in GOP to determine supply creation option as Make.
  • D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
  • E. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).

Answer: C,E

 

NEW QUESTION 26
As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

  • A. The Manufacturing Master Data Functional Area
  • B. The Supply Chain Orchestration Functional Area
  • C. The Manage product and Child Value Sets task
  • D. The Manage Items Profile Options tasks

Answer: A

 

NEW QUESTION 27
As a production supervisor, you require immediate access to critical shop floor execution systems to take action while on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?

  • A. Reviewing customer information of work orders
  • B. Reviewing operation, component, and resource detail
  • C. Creating a new standard or non standard work order
  • D. Executing standard work order and updating item and resource usage
  • E. Releasing work orders using quick swipe details
  • F. Searching for work orders and sending them through e-mail

Answer: A,B,E,F

 

NEW QUESTION 28
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

  • A. Production Priority
  • B. Version
  • C. Costing Priority
  • D. State Date

Answer: B,D

 

NEW QUESTION 29
Identify three requirements fulfilled by nonstandard work orders.

  • A. Repair
  • B. Rescheduling
  • C. Rework
  • D. Prototype

Answer: A,C,D

 

NEW QUESTION 30
Identify two reports that provide work order cost-related information to the costing user.

  • A. Cost Accounting Dashboard
  • B. WIP Balance by Plant
  • C. Purchase Variance Summary
  • D. Work order Operational Analysis

Answer: A,D

 

NEW QUESTION 31
The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day and Night Shift.
Identify the correct sequence of steps to achieve this requirement.

  • A. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column
  • B. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  • C. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  • D. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.

Answer: D

 

NEW QUESTION 32
A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.

  • A. Define Local sourcing rule for organization MP: Source Type Make At, Source MP
  • B. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP
  • C. Define Local sourcing rule for organization DW: Source Type Make From, Source MP
  • D. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW

Answer: A,B

 

NEW QUESTION 33
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

  • A. The engineer does not have the Manage Work Definitions function privilege.
  • B. The engineer does not have Data access to Items Attributes.
  • C. The engineer does not have Data access to Items.
  • D. The engineer does not have Data access to Item Structures.
  • E. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.

Answer: A,E

 

NEW QUESTION 34
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.

  • A. Create Accounting was not initiated.
  • B. Costs for purchase components P1 and P2 are not defined in cost accounting.
  • C. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
  • D. Create Accounting Distributions was not initiated.

Answer: D

 

NEW QUESTION 35
......

Oracle 1z0-1075-20 Real 2021 Braindumps Mock Exam Dumps: https://www.prep4surereview.com/1z0-1075-20-latest-braindumps.html