[2021] MB-330 Answers MB-330 Free Demo Are Based On The Real Exam MB-330 [Dec-2021 Newly Released] Exam Questions For You To Pass Microsoft MB-330: Job Roles One of the main reasons why people choose the Microsoft MB-330 exam is because it helps them to move forward in their careers. Once you pass this test and earn the associate-level certification, you will find it much easier to get interview calls. [...]

[2021] MB-330 Answers MB-330 Free Demo Are Based On The Real Exam [Q24-Q43]

Share

[2021] MB-330 Answers MB-330 Free Demo Are Based On The Real Exam

MB-330 [Dec-2021 Newly Released] Exam Questions For You To Pass


Microsoft MB-330: Job Roles

One of the main reasons why people choose the Microsoft MB-330 exam is because it helps them to move forward in their careers. Once you pass this test and earn the associate-level certification, you will find it much easier to get interview calls. It is a well-known fact that the companies prefer the certified specialists as they are quite skilled. So, if you complete this exam, you can apply for the following job roles: a Supply Chain Associate, a Functional Consultant, and a Solution Architect, among others. All of these positions come with good remuneration.


Microsoft MB-330 Exam Syllabus Topics:

TopicDetails

Implement product information management (20-25%)

Create and manage products-create and release products and product variants
- create and apply product templates
- create bills of materials (BOMs)
- identify the purpose and capabilities of the product configuration models
- create and configure category hierarchies
- configure catch weights
- create direct-delivery products
Configure products for supply chain management-create and manage inventory dimensions
- create item groups and item model groups
- create and print product labels
- create and assign bar codes and Global Trade Identification Number (GTIN) codes
- create product attributes
- configure product unit conversions
- configure default order settings
Manage inventory pricing and costing-describe inventory costing methods
- configure Costing versions for standard and planned costs
- configure and default purchase prices, default sales prices, and trade agreements
- perform an inventory close

Implement Inventory management (15-20%)

Configure Inventory management-set up inventory management parameters and journals
- configure and perform quality control and quality management processes
- configure inventory valuation reports
- configure ABC classifications
- configure inventory closing components
- implement inventory breakdowns
Manage and process inventory activities- create and process journals including bill of materials, item arrival, transfer, movement, inventory adjustment, counting, and tag counting journals
- create and process transfer orders
- process quarantine orders
- process quality orders
- perform inventory closings and adjustments
- apply inventory blocking

Implement and manage Supply Chain processes (15-20%)

Implement Procurement and sourcing- create and manage purchase requisitions, requests for quotes (RFQs), and purchase orders (POs)
- configure change management processes
- configure and apply vendor rebates
- implement and manage consignment inventory
- manage over and under deliveries and delivery schedules
- configure procurement categories and purchasing policies
- configure charges
Implement common sales and marketing features-configure quotations, sales orders, and return orders
- configure sales groups and commissions
- configure and manage discounts and price groups
- configure customer, product, and prospect searches
- implement and manage leads and prospects
- configure and process inter-company trade relations documents

Implement warehouse management and transportation management(20-25%)

Configure warehouse management- create sites, warehouses, locations, location formats, location profiles, location types, and zones
- implement location directives
- configure Inventory Statuses, unit sequence groups, and reservation hierarchies
- implement wave, load, and work templates
- configure mobile device menus, menu items, and display settings
Perform warehouse management processes-identify inventory movement processes
- perform cycle counting
- process inbound and outbound orders
- process shipments
- describe the replenishment process including buyers’ push and cross-docking
Implement transportation management-configure shipping carriers and carrier groups
- perform planning and executing of loads and shipments
- configure and generate freight bills and invoices
- configure rout plans and guides
- configure route and rate engines
- configure and use dock appointment scheduling
- plan loads by using hub consolidation
- reconcile freight by using manual or automatic processes

Implement Planning Optimization (15-20%)

Configure master planning and forecasting- Describe available forecasting types
- Configure planning optimization
- interpret Planning Optimization Fit Analysis results and take appropriate actions
- set up coverage groups and item coverage
- configure master planning parameters, master plan, forecast plans, and continuity plans
- Define positive and negative days
- define action messages, delay messages, and time fences
- configure period templates
Run master plans and manage planned orders- View and process planned orders
- set up and use the Supply Schedule form
- configure safety margins
- configure and process safety stock journals
- copy, edit, and delete master plans

 

NEW QUESTION 24
A company uses Dynamics 365 for Finance and Operations.
You just implement commission groups to match commission rates to products.
You need to configure commission tracking.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.

Answer:

Explanation:

Explanation

 

NEW QUESTION 25
You are the purchasing manager for a company. You enter into a consignment agreement with a vendor.
Raw material R0001 is managed under the consignment agreement with the vendor.
You need to replenish raw material R0001 for consumption and update ownership.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 26
You need to configure the structure for the new line of perfumes.
What should you do first?

  • A. Create a procurement category hierarchy.
  • B. Create product configurations.
  • C. Set up a new product master and implement serial tracking.
  • D. Create a new product with storage dimensions.
  • E. Create a new product with racking dimensions.

Answer: A

Explanation:
Topic 3, Adventure Works Cycles
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the button to return to the question.
Background
Adventure Works Cycles builds stock and custom mountain bikes and is headquartered in San Diego. It has the following assembly and warehouse locations:
* Denver, Colorado, United States
* San Diego, California, United States
* Budapest, Hungary
Most manufacturing is outsourced, with each facility only assembling the bikes. Parts are stocked at all facilities and may be transferred between warehouses or legal entities. All of the parts are at standard cost.
Current environment. Organizational structure
The following diagram shows the structure of Adventure Works Cycles.
* Each of the physical locations in the United States (US) is a warehouse.
* Hungary assembles and distributes products to the rest of the European Union (EU).
* The EU legal entity is expected to add additional warehouse locations.
* All legal entities roll up to a financial consolidation company.

Current environment. Purchasing
* Higher quality tires that are used in new orders have become popular. Due to the volume of orders, the company wants to negotiate pricing with VendorC. The vendor agrees to a discounted price for 500 tires purchased within the next six months. Once the 500 tires have been purchased, the discount will be re-evaluated based on demand.
* Once a purchase is approved, for audit purposes it cannot be changed.
* Whenever possible, parts are purchased from vendors also within the EU. A purchase order was placed for a bike seat manufacturer in Italy.
* Parts for custom orders may not always be kept in stock and will need to be procured.
Current environment. Purchasing requisitions
The following flow chart depicts the purchase requisition process:

Requirements. Purchasing
* Items for purchase requisitions are governed by each country. Each of the country-specific products will be grouped together for selection.
* Purchase orders must follow the requisition process.
* All existing purchase orders for brakes must account for the change to VendorB.
Requirements. Inventory
* Standard costs are based on purchase fluctuations within a single month.
* Tires use floating zones due to limited warehouse space.
Requirements. Operations
Due to recent brake failures, Adventure Works Cycles plans to purchase brakes from VendorB instead of VendorA. Although the brakes from Vendor B will continue to use the same item number as the brakes from VendorA, the price is slightly higher from VendorB. Adventure Works Cycles will pay list price from VendorB. The order for VendorB needs approval and the usual approver for purchase requisitions is on vacation.
All brakes from VendorA that are in stock must be tested. The process for brake testing must be implemented for all inbound orders. Quality orders must be automatically created upon receipt of the first shipment against a purchase order only.
UserC needs to consolidate brake inventory after it has been cleared for sale.
Ordering of the new brakes order will incur an additional cost because it is a rush order.
Requirements. Custom orders
* Custom orders are placed for items that do not exist in the item master.
* Hungary does not process custom orders.
* The United States does process custom paint orders. Most custom paint colors are special order and require purchase requisitions.
* Quotes must be obtained from a minimum of two suppliers per company policy and compared for the shipping, costs, and other variables. Quotes will not be selected based on lowest price only.
Issues
* A special order for 26 high-end tires is received. This item is no longer in stock from the current vendor.
* Goods have been received in stock, but the matching invoice has not yet been received at the time of month close.
* UserA needs to set up pricing for the items purchased from VendorC and ensure that accounting validates the receipt and invoice against the agreement.
* UserB needs to send out a request for quotation (RFQ) for custom paint. The vendor will be selected based on pricing, volume discounts, and lead time.

 

NEW QUESTION 27
You need to implement location directives in Dynamics 365 for Finance and Operations.
Which objects should you use? To answer, drag the appropriate objects to the correct permissions. Each object may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 28
A company implements Dynamics 365 for Finance and Operations.
You are the primary approver for purchase requisitions that are greater than $500,000. You are going on vacation for two weeks.
You need to assign another user as the approver only for purchase requisitions greater than $500,000.
What should you do?

  • A. Under User Options, add a user and assign the scope of Workflow
  • B. Under User Options, add a user and assign the scope of Module
  • C. Under User Options, add a user and assign the scope of All

Answer: A

Explanation:
Section: Configure security, processes, and options

 

NEW QUESTION 29
:117
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company has an agreement to pay royalties to a third party for use of their logo.
A royalty contract must be setup so that the third party paid monthly. The payment is based on invoiced sales.
You need to create a royalty contract and create monthly Accounts payable to the third party.
Solution: Create a royalty contract. Select monthly for the cumulative sales. Add line item, products, and value to pay the vendor for use of the logo.
Doss the solution meet the goal?

  • A. No
  • B. Yes

Answer: B

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/finance/accounts-payable/royalty-contract

 

NEW QUESTION 30
You need to define the value of the brakes.
What should you set up? To answer, select the appropriate options in the area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 31
A primary vendor tells you that their purchase order (PO) items will be delivered seven days later than expected. You find another vendor that carries the product and can deliver it the next day.
You need the purchases from both vendors, but only one PO exists in the system.
You need to ensure that the system correctly reflects the inbound products from both vendors.
How should you complete the setup? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

Answer:

Explanation:

Explanation

 

NEW QUESTION 32
A company has several vendors who require 1099s.
You need to set up the vendors so that year-end reports can be correctly generated.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 33
You are the sales manager at a distribution company.
You have a drop-ship order for a batch of chemicals that will go directly from your vendor to your customer.
You need to create and process this direct delivery within Dynamics 365 Finance and Operations.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 34
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
You are a functional consultant who is deploying Dynamics 365 for Finance and Operations.
The implementation must:
* Use an iterative approach
* Integrate with real-world data
* Enforce standards and governance
* Implement multiple rounds of feedback
You need to deploy and validate the implementation.
Solution: Deploy the out-of-the-box solution. Enable users to customize the solution based on individual user scenarios.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Section: Validate and support the solution
Explanation/Reference:

 

NEW QUESTION 35
A company manufactures wood furniture.
Cabinets can be purchased with different wood finishes including oak and maple.
You need to configure a product attribute to characterize the types of cabinet finishes.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 36
A company is implementing sales order functionality in Dynamics 365 Supply Chain Management.
The company has a business requirement to fulfill sales orders by using direct delivery.
You need to enter a direct delivery sales order so that a purchase order is automatically created.
What should you do after you enter the sales order and lines?

  • A. Select automatic and confirm the sales order on the line level setup tab in the reservation field.
  • B. Change the site to direct delivery and confirm the sales order.
  • C. Change the delivery type on the sales order to direct delivery and select save.
  • D. Change the order type to journal and manually enter a PO for the sales order line items on the sales order header.

Answer: C

 

NEW QUESTION 37
A company has several warehouse locations. The company acquires a new warehouse.
You must design a new warehouse process workflow for the new warehouse.
You need to configure the workflow.
Which three features should you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. outbound wave processing
  • B. work pools
  • C. cluster picking
  • D. work templates
  • E. wave templates

Answer: B,D,E

 

NEW QUESTION 38
You are the purchasing manager for a company. You enter into a consignment agreement with a vendor.
Raw material R0001 is managed under the consignment agreement with the vendor.
You need to replenish raw material R0001 for consumption and update ownership.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 39
New order items arrive from vendors and come into a company's main warehouse.
You must set up internal transportation processes in Dynamics 365 for Finance and Operations to distribute goods to other locations.
You need to set up inbound orders through transportation management.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.

Answer:

Explanation:

 

NEW QUESTION 40
You are the sales manager at a distribution company.
You have a drop-ship order for a batch of chemicals that will go directly from your vendor to your customer.
You need to create and process this direct delivery within Dynamics 365 Finance and Operations.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 41
Employee! must set up the new BOM.
Which three actions should Employee! perform' Each correct answer presents part of the solution.
NOTE Each correct selection is worth one point.

  • A. Add the raw materials to the BOM and approve it.
  • B. Create a new BOM for Store1, Store2, and Store3.
  • C. Add the raw mandate to the BOM and approve the BOM version.
  • D. Create a new BOM for Site! only.
  • E. Activate the BOM.

Answer: A,B,E

Explanation:
Topic 3, Adventure Works Cycles
Case Study
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background
Adventure Works Cycles builds stock and custom mountain bikes and is headquartered in San Diego. It has the following assembly and warehouse locations:
Denver, Colorado, United States
San Diego, California, United States
Budapest, Hungary
Most manufacturing is outsourced, with each facility only assembling the bikes. Parts are stocked at all facilities and may be transferred between warehouses or legal entities. All of the parts are at standard cost.
Current environment. Organizational structure
The following diagram shows the structure of Adventure Works Cycles.
* Each of the physical locations in the United States (US) is a warehouse.
* Hungary assembles and distributes products to the rest of the European Union (EU).
* The EU legal entity is expected to add additional warehouse locations.
* All legal entities roll up to a financial consolidation company.

Current environment. Purchasing
* Higher quality tires that are used in new orders have become popular. Due to the volume of orders, the company wants to negotiate pricing with VendorC. The vendor agrees to a discounted price for 500 tires purchased within the next six months. Once the 500 tires have been purchased, the discount will be re-evaluated based on demand.
* Once a purchase is approved, for audit purposes it cannot be changed.
* Whenever possible, parts are purchased from vendors also within the EU. A purchase order was placed for a bike seat manufacturer in Italy.
* Parts for custom orders may not always be kept in stock and will need to be procured.
Current environment. Purchasing requisitions
The following flow chart depicts the purchase requisition process:

Requirements. Purchasing
* Items for purchase requisitions are governed by each country. Each of the country-specific products will be grouped together for selection.
* Purchase orders must follow the requisition process.
* All existing purchase orders for brakes must account for the change to VendorB.
Requirements. Inventory
* Standard costs are based on purchase fluctuations within a single month.
* Tires use floating zones due to limited warehouse space.
Requirements. Operations
Due to recent brake failures, Adventure Works Cycles plans to purchase brakes from VendorB instead of VendorA. Although the brakes from Vendor B will continue to use the same item number as the brakes from VendorA, the price is slightly higher from VendorB. Adventure Works Cycles will pay list price from VendorB. The order for VendorB needs approval and the usual approver for purchase requisitions is on vacation.
All brakes from VendorA that are in stock must be tested. The process for brake testing must be implemented for all inbound orders. Quality orders must be automatically created upon receipt of the first shipment against a purchase order only.
UserC needs to consolidate brake inventory after it has been cleared for sale.
Ordering of the new brakes order will incur an additional cost because it is a rush order.
Requirements. Custom orders
* Custom orders are placed for items that do not exist in the item master.
* Hungary does not process custom orders.
* The United States does process custom paint orders. Most custom paint colors are special order and require purchase requisitions.
* Quotes must be obtained from a minimum of two suppliers per company policy and compared for the shipping, costs, and other variables. Quotes will not be selected based on lowest price only.
Issues
* A special order for 26 high-end tires is received. This item is no longer in stock from the current vendor.
* Goods have been received in stock, but the matching invoice has not yet been received at the time of month close.
* UserA needs to set up pricing for the items purchased from VendorC and ensure that accounting validates the receipt and invoice against the agreement.
* UserB needs to send out a request for quotation (RFQ) for custom paint. The vendor will be selected based on pricing, volume discounts, and lead time.

 

NEW QUESTION 42
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
You are the purchasing manager at a manufacturing company that makes audio equipment.
You sign an agreement with a vendor to purchase 5,000 speaker cables, item C0001, at a discounted rate of
$3.00 per cable. This agreement expires in exactly one year.
You need to set up pricing information and track the fulfillment of the agreement.
Solution: Create a purchase agreement for the vendor that specifies a product quantity commitment. Include the quantity, the price, and the expiration date.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: B

Explanation:
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/procurement/purchase-agreements

 