Pass Guaranteed Quiz 2021 Realistic Verified Free DES-1221 Exam Dumps Free DCS-IE DES-1221 Ultimate Study Guide (Updated 62 Questions) What is the cost of Specialist – Implementation Engineer, PowerStore Solutions Version 1.0 Format: Multiple choices, multiple answersNumber of Questions: 40Passing Score: 70%Length of Examination: 90 minutes Exam Topics for Specialist – Implementation Engineer, [...]

Pass Guaranteed Quiz 2021 Realistic Verified Free DES-1221 Exam Dumps [Q17-Q35]

Share

Pass Guaranteed Quiz 2021 Realistic Verified Free DES-1221 Exam Dumps

Free DCS-IE DES-1221 Ultimate Study Guide (Updated 62 Questions)


What is the cost of Specialist – Implementation Engineer, PowerStore Solutions Version 1.0

  • Format: Multiple choices, multiple answers
  • Number of Questions: 40
  • Passing Score: 70%
  • Length of Examination: 90 minutes

Exam Topics for Specialist – Implementation Engineer, PowerStore Solutions Version 1.0

Understanding functional and technical aspects of Specialist – Implementation Engineer, PowerStore Solutions Version 1.0 PowerStore Concepts and Features (5%)

The following will be discussed in DELL DES-1221 exam dumps:

  • Describe the PowerStore system and use cases
  • Identify the PowerStore system configurations and models
  • Provide an overview of PowerStore architecture and hardware components

 

NEW QUESTION 17
An administrator received a request to provision a new volume. Use the simulator to provision a volume of
50 GB with a performance policy of high for their host named "ApplicationTeam". When you have finished using the simulator, click Next.

Answer:

Explanation:
check the answer below in explanation.
Explanation
Below are the exhibits solution for this simulation.






 

NEW QUESTION 18
1.a.1 What is the maximum number of appliances that can be connected to form a cluster?

  • A. 4 in a PowerStore T cluster, 4 in a PowerStore X cluster
  • B. 1 in a PowerStore T cluster, 1 in a PowerStore X cluster
  • C. 4 in a PowerStore T cluster, 1 in a PowerStore X cluster
  • D. 1 in a PowerStore T cluster, 4 in a PowerStore X cluster

Answer: C

 

NEW QUESTION 19
Match the correct Base Enclosure port in column A to the Expansion Enclosure port in column B to show the correct cabling for adding a single expansion enclosure to a base enclosure.

Answer:

Explanation:

Reference:
https://www.dell.com/support/manuals/en-pk/powerstore/pwrstr-isg/cable-the-base-enclosure-to-the- expansion-enclosure?guid=guid-d68d049f-2b77-489f-b1ab-553f4f3de8aa&lang=en-us

 

NEW QUESTION 20
A PowerStore X system is being implemented using Dell EMC S5248F-ON Ethernet switching as data switches.
What is required when configuring the VLT interconnects on the data switches?

  • A. Set the VLT connection to the switch default VLAN
  • B. On each switch, select the switch management port MAC as the VLT MAC
  • C. Assign the switch default route for the VLT traffic
  • D. Configure the VLT MACs with a matching unique made-up address

Answer: B

 

NEW QUESTION 21
How is the upgrade process on a multi-appliance cluster run?

  • A. In parallel on all nodes
    Upgrade
    The upgrade process runs on a single node at a time:
    * Starts with the primary appliance
    - Non-primary node first
    * Control Path
    - Turns off all schedulers
    - Disable RestAPI for writes
    * Waits for ongoing management operations to complete
    Backs up management DB
    * Disables Primary Appliance Failover
    * GUI and RestAPI are unavailable for a short period of time during Control Path failover
  • B. On all primary nodes first, then peer nodes
  • C. On one node at a time
  • D. Master appliance primary node first, then the peer node

Answer: C

 

NEW QUESTION 22
Correctly arrange the sequence of the write operation in PowerStore.

Answer:

Explanation:

 

NEW QUESTION 23
Use the simulator to determine how many logical ports are currently marked for replication on the PowerStore appliance.
Note: It is necessary to close (x) the simulator window before you can select a response to this question.

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B

 

NEW QUESTION 24
A storage administrator has provisioned 10 x 2GB volumes. 400MB of data is written to each of the ten volumes. What is the Thin Savings ratio for this configuration?

  • A. 3:1
  • B. 6:1
  • C. 4:1
  • D. 5:1

Answer: B

 

NEW QUESTION 25
Which network is used by the PowerStore for communication to the cluster database?

  • A. ICM
  • B. ICD
  • C. inter-node
  • D. IDN

Answer: A

 

NEW QUESTION 26
1.a.1 What is the maximum number of appliances that can be connected to form a cluster?

  • A. 4 in a PowerStore T cluster, 1 in a PowerStore X cluster
  • B. 4 in a PowerStore T cluster, 4 in a PowerStore X cluster
  • C. 1 in a PowerStore T cluster, 1 in a PowerStore X cluster
  • D. 1 in a PowerStore T cluster, 4 in a PowerStore X cluster

Answer: B

 

NEW QUESTION 27
A protection policy with snapshot and replication rules is applied to a file system. What is the result?

  • A. Both replication and snapshot rules get applied
  • B. Applying the protection policy to the file system fails
  • C. Snapshot rules get ignored and only replication rules get applied
  • D. Replication rules get ignored and only snapshot rules get applied

Answer: D

 

NEW QUESTION 28
An administrator assigns a protection policy to a volume group. Volume1, Volume2, Volume3 are put into the volume group. Later it is decided that Volume2 should be replicated at a different time. Volume2 is removed from the volume group. The administrator attempts to assign a new protection policy to Volume2 and the option is greyed out.
Why is the option greyed out?

  • A. Requires a snapshot rule and a replication rule
  • B. Requires a replication rule not a protection policy
  • C. Already has a protection policy from the Volume-Group
  • D. Still has associated Volume-Group snapshots

Answer: C

 

NEW QUESTION 29
Which ports are recommended for use as the interconnect between the two Dell supplied Data Switches connected to PowerStore?

  • A. Two 25 GbE
  • B. Four 1 GbE
  • C. Two 10 GigE
  • D. Two 100 GigE

Answer: A

 

NEW QUESTION 30
How many cables are required for minimum support for PowerStore T Front-End storage connectivity?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B

 

NEW QUESTION 31
Which IP addresses are required when adding an appliance to the cluster?

  • A. Management and Storage
  • B. Storage and NTP
  • C. Management and DNS
  • D. DNS and NTP

Answer: A

Explanation:
Reference: https://www.dell.com/support/manuals/en-pk/powerstore/pwrstr-ntwk-plang/ip-address- requirements-for-initial-configuration?guid=guid-cdb61296-b698-47fb-92ce-284f784cbc2d&lang=en-us

 

NEW QUESTION 32
When planning rack layout, why should base enclosures be grouped together?

  • A. Hot aisle requirement
  • B. Power distribution requirements
  • C. Rack weight balance
  • D. Ease of cable management

Answer: B

 

NEW QUESTION 33
A SQL Cluster with attached PowerStore storage has Volumes SQL1, SQL2, SQL4, SQL5 which all require write order preservation. The SQL administrator no longer requires SQL4 and has removed it from the database. The Storage Administrator goes to delete volume SQL4 and finds that the option is grayed out.
Why is the option to delete the volume unavailable?

  • A. SQL4 is part of a volume group
  • B. SQL4 still has replications
  • C. SQL4 was renamed from SQL3
  • D. SQL4 still has snapshots

Answer: A

 

NEW QUESTION 34
Correctly arrange the sequence of the write operation in PowerStore.

Answer:

Explanation:

Reference:
https://www.delltechnologies.com/resources/en-us/asset/white-papers/products/storage/h18151-dell-emc- powerstore-data-efficiencies.pdf

 

NEW QUESTION 35
......


The appropriate audience includes those who use PowerStore systems to position, design, deploy, maintain and support solutions. To undertake this training, participants are advised to have skillsets that are similar to the prerequisites of the above course. By the end of the program, one will gain mastery in the following objectives:

  • Administering storage resources as well as services for PowerStore
  • Upgrading hardware as well as software for PowerStore systems
  • Capacity in initializing and deploying systems for PowerStore
  • Carrying out basic tasks in troubleshooting for PowerStore systems
  • Ability to physically install as well as cable systems for PowerStore

The modules that will enable the coming up of such knowledge include physical installation, system initializing, configuration for deployment, and administration, among the rest.

 

Get to the Top with DES-1221 Practice Exam Questions: https://www.prep4surereview.com/DES-1221-latest-braindumps.html

Use Real DES-1221 Dumps Free Sample Questions and Practice Test Engine : https://drive.google.com/open?id=1a8eI2K0r9vKmHIW3QqRq3IK5zLyz0WCU